Geotechnical Engineering II Field Trip to Sand Island Wastewater Treatment Plant
On Friday, September 25, the CEE 455 Geotechnical Engineering 2 students were given a tour of the construction of the Phase 1 upgrades at the Sand Island Wastewater Treatment Plant. The students received insightful engineering design and construction engineering considerations…
